4 Days, 3 Night(s)
Mt. Meru ngogongare routeThe mountain is the centrepiece of Arusha National Park and its fertile slopes rise above the surrounding savanna and support a forest that hosts diverse wildlife, including nearly 400 specie
After breakfast depart Moshi about 8:30 a.m drive to Momella gate. Make payment and start the climb with picnic lunch to the first hut called Miriakamba hut. Dinner and overnight β Miriakamba hut (3 Β½ hrs).
Distance: Elevation:1597m/5240ft to 2503m/8212ft Altitude gained: 906m KM Transport: Walking Safaris
Accommodation: Miriakamba huts π | Meal Plan: Breakfast,Lunch,Dinner
After breakfast we proceed with a climb to second hut called Saddle. This is too steep part compared to the first part (2 Β½). During the afternoon, client can decide to attempt climbing little Meru peak and back. Dinner and overnight β Saddle hut.
Distance: Elevation: 2503m/8212ft to 3560m/11,680ft Altitude gained: 1057m KM Transport: Walking Safaris
Accommodation: Miriakamba huts π | Meal Plan: Breakfast,Lunch,Dinner
Wake up at middle-night and have a cup of tea before starting attempt big Meru peak. Proceed to summit crossing rocky path and back to Saddle hut for full breakfast. The day will be spent resting. Lunch, dinner and overnight at Saddle hut.
Distance: Elevation: 3560m/11,680ft to 4566m/14980ft Altitude gained: 1006m Descent to 3560m/11680ft Altitude lost: 1006m KM Transport: Walking Safaris
Accommodation: Saddle huts π | Meal Plan: Breakfast,Lunch,Dinner
Leave Saddle hut and descend down to Momella gate via first hut (Miriakamba) where you will be transferred to Arusha/Moshi.
Distance: Elevation:3560m/11,680ft to 1597m/5240ft Altitude lost:1963m KM Transport: Walking Safaris
Accommodation: Ngngongare gate | Meal Plan: Breakfast,Lunch
Kim L. Burney
Cras sit amet nibh libero, in gravida nulla. Nulla vel metus scelerisque ante sollicitudin commodo. Cras purus odio, vestibulum in vulputate at, tempus viverra turpis.
Shing Ch'in